Identify Challenge and Discover Solution:

Bridges & Roads
Structures
Infrastructure
Settled bridge approach slabs – slab-on-grade or resting on sleepers
Settled concrete paved roads, highways, runways, tarmacs
Wash-out & sink-hole remediation
Settled concrete rail crossing structures
Construction on perma frost, reactive clays and other weak soils
Restoring load transfer to damaged concrete pavements
Abandoning culverts, ducts & pipes
Abandoning culverts, ducts & pipes
Insulation & sealing of mechanical & electrical vaults
Insulation & sealing of mechanical & electrical vaults
Concrete pavement panel replacement
Concrete pavement panel replacement
Any differentially settled non-structural slab-on-grade concrete structures in plants, warehouses
Rocking concrete floor panels
Settled concrete parking/parkade structures on grade structures
Settled walks, driveways, patios and poured in place steps
Settled pool decks and aprons
Strengthening & sealing hollow core block walls/foundations
Slab-on-grade, Rafted & footed foundations
Abandoning of sub-grade culvert pipes and ducts
Annular space filling in tunneling and sleeving process
Water infiltration/exfiltration in tunnels, catch-basins, manholes, vaults, deep storm systems, lift stations
Secondary containment, tailings ponds, erosion control
Re-establish friction on failing friction piles
Shoring system in granular soils
Densification of weak base soils
Re-establish friction on failing friction piles