Identify Challenge and Discover Solution:

Settled shop/plant floors
Leaking catch basins, man-holes, pipes
Settled bridge approaches
Re-establish friction on failing piles
Strengthening hollow core block walls
Shoring system in granular base soils
Void-conditions under floor slabs
Wash-out and sink hole remediation
Trip hazards on differentially settled walk panels
Settled concrete parking/loading areas
Stabilizing very weak soils conditions like peats –
Blast rock stabilization –
Abandoning of sub-grade pipes and ducts
Annular space filling in tunneling and sleeving process