Identify Challenge and Discover Solution:

Void-conditions under floor slabs
Wash-out and sink hole remediation
Trip hazards on differentially settled walk panels
Settled concrete parking/loading areas
Strengthen hollow core block walls
Settled retail/wholesale floors
Abandoning of sub-grade pipes and ducts